grey exit X
Take a personalized
self-guided tour
Your Company
fulcrum browser interface
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Product Updates

Weekly updates to Fulcrum, always included with your subscription.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Material Remnant Improvements

As part of Fulcrum’s materials database feature, it’s much simpler to create and manage remnants.  To improve that experience, this release adds some enhancements:

1) Previously, you couldn’t reopen an operation that had a remnant created on it.  Now you can!

2) You can now designate a location when adding a remnant to inventory from the job tracker.  If the material the remnant was created from is lot tracked, the remnant will use the same lot number for material traceability.

Material Remnant Improvements
Share ->

Material Improvements

We are continuing to polish the materials workflow for sheet and plate. A variety of bug fixes have been included in this release. Most notable improvements:

  • Ability to edit vendor pricing for material items from the BOM
  • More robust job logs for remnant creation
  • Reincorporated the active filter on the materials grid
Material Improvements
Share ->

Expanded Reporting

Fulcrum gathers detailed information from every part of your business. The ability to access and report on this data helps teams keep a pulse on performance.  We’ve recently added a custom reporting module and have been steadily adding to the available reports. This release includes the following additional datasets:

  • NCRs and CAPAs, including Impacts
  • Shipping
  • In Process Tracking

Take a look and let us know what you think!

Expanded Reporting
Share ->

Shop Rate

Fulcrum now supports Shop Rate pricing—a new way to calculate prices based on a percentage of material cost, a percentage of outside processing, and an hourly operation rate. You can set a default shop rate on the item page or apply it directly to a quote or sales order line item.

To use Shop Rate pricing, toggle the shop rate switch on the item’s sales page or on a part line item. The price will update automatically as you adjust the material percentage, which is set in the input field adjacent to the price. A detailed breakdown of the price will appear when hovering over the price on the item’s sales page when shop rate is selected.

The operation’s hourly rate and the outside processing percentage are both set on their respective operation's page in System Data.

Shop Rate
Share ->

Performance Improvements

Strategically, Fulcrum has staffed a group of senior engineers to work on performance and bug fixes.  The impact of this won’t be felt overnight, but the collective efforts of this team over the next few weeks should be significant.  Some notable improvements and fixes from the first week:

  • Chat mentions will correctly notify the recipient.
  • Rewrite of how the receiving grid loads information.
  • Improved start up procedure -  this means any midday maintenance will be mostly unnoticed, and included automated alerts to the performance team to proactively respond to issues.
  • Other miscellaneous improvements, with more to come!
Performance Improvements
Share ->

Updated Sales Order Reporting Dataset

We’ve launched a new, more robust “Sales Order Details (Current)” dataset in the reporting module—bringing us closer to full custom reporting. Designed for flexibility, this dataset lets you build detailed custom reports using sales order line item data.


New fields include:

  • Estimated Cost to Produce
  • Actual Job Cost to Produce
  • Shipment Qty/Value Outstanding

Note: As part of spring cleaning, this dataset will replace the following:

  • Sales Order + Line Item Data
  • Sales Order Data
  • Sales Order Line Item Data

Please update your reports using “Sales Order Details (Current)” going forward. Reach out to your Launch or Account Manager with any questions!

Updated Sales Order Reporting Dataset
Share ->

Report Builder - Additional Datasets Now Available!

Over the past few weeks, we’ve added new datasets to the Report Builder, including Inventory Detail, Invoice Detail, Purchase Order Detail, and Vendor Issues.To create your own custom report, navigate to the Report Builder module, start a new report, and select one of these datasets. If Report Builder isn’t enabled on your site, reach out to your Launch or Account Manager for more info!

Stay tuned for additional datasets covering jobs, sales orders, and more!

Report Builder - Additional Datasets Now Available!
Share ->

Materials Workflow Improvements on the BOM & Routing

Materials Workflow Improvements on the BOM & Routing
We've updated the materials workflow in the BOM & Routing to clarify the difference between raw materials and items linked to materials, along with their downstream effects.

Raw Materials on the BOM: Estimating Tab

You can add raw materials to a BOM and estimate costs using the nesting estimator tool, allowing jobs to move through production without assigning a specific item, size, or inventory. This provides flexibility in material and job costing from quoting to production.

You can assign a specific item later or let operators choose the most efficient option directly in Job Tracking, where they’ll select from a list of items linked to that raw material.
Costing is managed through the nesting estimator tool, which uses primary vendor pricing. You can create different nest sizes for estimated costs and even edit vendor details or add a new vendor directly from the BOM side panel. Important: Using raw materials is required for Nest Planning, which helps group jobs using the same material. If you plan to group work, do not assign an item instead of a raw material in the BOM.

Items / Inventory associated with Materials on the BOM: Inventory Tab

You can still add items associated with materials through the Inventory tab when you know the exact item for the job or are purchasing for it. Operators will see the specific item in the picking tab of Job Tracking.

We've improved costing flexibility by allowing you to adjust the material length used. Keep the full length for full-cost pricing or enter the actual length needed for accurate costing.


REMNANTS

Raw Material: Remnants from raw materials are determined by the item the operator selects in Job Tracking. The remaining cost is automatically calculated based on the portion used.
Usage based Item: If you add an item to the BOM and cost for only the length (portion) that you’ll use, the remnant produced from that will automatically receive the remaining cost.
Full cost item: If you use an item on the BOM and cost for the full piece and a remnant is produced, the value of that remnant will be zero dollars.

Materials Workflow Improvements on the BOM & Routing
Share ->

Time Estimates in Soft Nesting

We’ve expanded the functionality of Quote Nestimation to provide you an estimated machine time for the part!

Because every machine’s capabilities are different, we’ve added a Feed Rate editing section to your machine setup page. Here you can use the feed rates and pierce times for each of your cutting machines based on the material they’re working with.

If you have an export of feed rates from your machine or nesting software and would like them to be bulk imported, feel free to send them to josh@fulcrumpro.com to have them imported. Nestimation is currently in beta testing, but we're planning on releasing it to all customers who are a part of the materials beta this week. This feature is not available for customers hosted on our ITAR-compliant servers.

Time Estimates in Soft Nesting
Share ->

Updated Job UI

We've improved the job status button for clarity. Now, the current status appears at the top, and clicking the button opens a dropdown to change it. Previously, it showed only the next step in a linear flow. The delete/cancel options are now in the "More Options" icon outside of the status button.

Updated Job UI
Share ->

Bulk Item Label Printing

We've added new Bulk Print Item Labels, allowing you to print labels for multiple items from the grid in one action, streamlining the process of label printing.

If the grid contains a large number of items (e.g., over 1000), loading labels may take longer. Please be mindful of the number of labels being processed at once.

Bulk Item Label Printing
Share ->

Quick Quotes with Nestimation

To help fabricators send competitive quotes faster, we’ve integrated nesting into the quoting module. This feature calculates estimated material costs and run times automatically.

Simply drop in your DXF files, and Fulcrum generates a soft nest, estimating material costs based on the flat file dimensions. It also calculates machine time by analyzing Pierce points and referencing your machine’s speed and feed table, which can be uploaded and stored in your settings.

Once machine time and usage estimates are generated, they’re applied directly to the quote—giving you faster, more accurate estimates for your customers.

Quick Quotes with Nestimation
Share ->

Fulcrum in 4: In-Progress Job Edits, New Materials, PO Workflows, and Nesting Estimates

In this episode of Fulcrum in 4, Launch Manager Mitch LaFrance breaks down the latest updates designed to make your manufacturing workflow more efficient. We’ve expanded the materials database, improved the purchase order workflow, enabled in-progress job edits, and enhanced quote estimates for nested work.

  • Materials Database Updates – New material types added, improved grid navigation, and bulk vendor/item association.
  • Purchase Order Enhancements – Assign materials to specific jobs, update pricing post-invoice, and print receiving labels with job associations.
  • In-Progress Job Edits – Modify BOMs and routings even after a job has started.
  • Nesting in Quoting – Upload DXF files to auto-calculate material costs and machine time for faster, more accurate estimates.

These updates are designed to help you maximize shop capacity and streamline daily operations. Watch now to see them in action!

Chapters

  • 00:00 Intro
  • 00:16 Improved Materials Database
  • 01:01 Purchase Order Enhancements
  • 02:28 In-Progress Job Edits and Flexibility
  • 03:10 Quick Quotes with Nestimation
  • 03:45 Conclusion
Fulcrum in 4: In-Progress Job Edits, New Materials, PO Workflows, and Nesting Estimates
Share ->

BOM Edits for In-Progress Jobs

We’re continuing work on editing in progress jobs. With the next update, you’ll be able to change the items on the job, both adding additional items to make and changing the required materials of the job.

BOM Edits for In-Progress Jobs
Share ->

Purchase Order Price Updates

We recently added a bit more flexibility around updating the purchase price after receiving. You are now able to change the purchase price (select ‘Yes’ for ‘Different billed subtotal?’ and enter the new subtotal in the ‘Billed Subtotal’ field), if the items received have not been consumed (no inventory picks against those items). This is a small change from the previous functionality where any inventory transactions against the item prevented changing the purchase price. We're continuing to work on expanding this functionality out even more.

Purchase Order Price Updates
Share ->