Sampling Plans Follow the Quantity Produced

Inspection
Quality Plans
Job Quality

When an operation makes more parts than planned, sampling plans now recount for the quantity actually made. This covers Percentage, ANSI/ASQ Z1.4 (American National Standards Institute/American Society for Quality) and C=0 (accept on zero defects) plans. The Run tab shows the extra sample slots, so over-produced parts no longer slip through without a check.