Fulcrum at IMTS 2026
Booth 135816
Happy hour at Seville Rooftop
Get the details →
grey exit X
Take a personalized
self-guided tour
Your Company
fulcrum browser interface
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
August 13, 2026
Quality

Create an NCR Directly from a Rework in Job Tracking

NCR
Job Tracking

Reworks and their NCRs (Non-Conformance Reports) used to be two disconnected records, even though the large majority of reworks end up with one. A new "Create NCR" checkbox on the Rework window (shown based on your permissions) now creates an NCR pre-filled from the rework — affected quantity, disposition, reason/notes, tied to the same job, operation, and part — and links the two records together. Works on both work-order jobs and plain (non-work-order) jobs.