You can now define labor rates for each operator on their user setup page. If set, user-level rates prevail and are used in actual job cost calculations. If an operator does not have a user-level rate defined, we use the existing workcenter rates (current behavior). If multiple operators work on a job and have different user-level rates, the rate displayed in the actual costs will reflect a blended (weighted average) rate. Estimates will still be based on work center rates.