All jobs which have the 'continuous flow' checkbox enabled on their routings will now have their operations overlap in the scheduler. This will only happen when the operations fit into the restrictions outlined in the outside processing. Operations in a process group, for outside processing, or those with fixed run times (not per-unit) will not be allowed to overlap. All other operations on a job with continuous flow checked will overlap. This is a simple version of continuous flow we will continue to make adjustments to improve.