October 17, 2025
Production

Missing Material Tag Updates

Materials
Schedule
Real-Time Operations

Previously, if a job was missing material, then every operation for that job would show the ‘missing material’ flag on the schedule page. However, this overstated the issue, since material could be associated to a specific operation - i.e. not every operation is missing material, only the ones that need it. Now, if material won’t be available, and is associated to a specific operation, then only that operation will be tagged as ‘missing material’.