October 31, 2023
Sales
Production

Associating Items to Operations

BOM/Routing
Items

It’s now easier to set items as required on specific operations. 

This reduces the time to set up your BOM, makes it easier to control scheduling, and improves work order creation and material picking.

  • You can add or remove an operation association right from the BOM. 
  • You’ll see items already added to the BOM show up as options when you go to set required items within the routing.
  • If an item is required multiple times throughout a job, you’ll see the item show up multiple times on the BOM. This means a clearer connection between items and routing steps, so deleting or adjusting an item from the BOM will update it on the routing step (and vice versa).